Art Building B Readies For Demolition

If you're looking for something to do this summer, why not make a bid to be the contractor that demolishes one of the buildings in the Art Complex?
The Contractor shall provide all of the materials, equipment, labor and coordination required to render a complete demolition and asbestos abatement of all structures to include foundations, piers, drives, walkways and sidewalks of Art Building B, located at 2021B Sam Houston Avenue.

Of note:
  • The tract consists of an older model residence building with two floors totaling approximately 3000 Square Feet. Main building foundation is a combination of pier/beam and concrete, which are to leave alone, but wooden structure to be demolished.
  • Bidder must agree to begin the work within ten (10) working days from the issuance of a purchase order and complete the job no later than Wednesday, July 20, 2016, unless the contractor has applied in writing to Sam Houston State University for an extension.