The Contractor shall provide all of the materials, equipment, labor and coordination required to render a complete demolition and asbestos abatement of all structures to include foundations, piers, drives, walkways and sidewalks of Art Building B, located at 2021B Sam Houston Avenue.
Of note:
- The tract consists of an older model residence building with two floors totaling approximately 3000 Square Feet. Main building foundation is a combination of pier/beam and concrete, which are to leave alone, but wooden structure to be demolished.
- Bidder must agree to begin the work within ten (10) working days from the issuance of a purchase order and complete the job no later than Wednesday, July 20, 2016, unless the contractor has applied in writing to Sam Houston State University for an extension.
Sunday, May 29, 2016
Art Building B Readies For Demolition
If you're looking for something to do this summer, why not make a bid to be the contractor that demolishes one of the buildings in the Art Complex?
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment